Why Commune?
It’s a first of its kind community living concept where
80% of one’s basic needs would be fulfilled within the
project area and hence will be a self contained township
What is a self contained township?
A residential gated area with an underlying promise
of prestige, security, self sufficiency and sustainability.
Commune will have 3300 units and facilities like shopping,
mini stadium for sports, entertainment, children’s play
areas, medical store, school, restaurants and cafes
etc.
Where is Commune exactly?
It is located very near to Tellapur-which is another
Madhapur In making. The Project abuts the Outer Ring
Road (ORR)ensuring great connectivity to any part of
the City.
How do we get to this location
and what would be the drive time?
It is near Tellapur and:
From Tellapur/Techocity it is just 5 minutes.
From Gachibowli IT district it is 15 minutes
From Hitec City – it is 20 minutes
From Airport – it is 30 minutes drive along the ORR.
How is Commune different?
The construction standards are world class as the entire
structure is of concrete. There is no use of bricks
at all, making it fire safe. Usually the slabs (roof
& floor) are concrete, but in Commune even the walls
are concrete. As there is minimal human involvement
in concrete casting compared to the more conventional
cast-in-place method, uniformity and quality is almost
inch perfect.
It espouses the concept of community living which is
a first in the category and all basic needs are catered
to within the project
The construction is extra safe, durable and weather
resistant and therefore low on maintenance.
What is the management promise?
To deliver world class affordable integrated townships
for the common man
Under which authority does the Commune come under?
HMDA
When is the HMDA sanction expected?
Around FEB 09
What is the size of the project?
The project will be home to 3500 homes.
What are the apartment sizes available?
In Phase 1 there will be only 2 BHK options in the following
Super Built up Areas. The sizes have been optimized,
post extensive consumer research for mostly first time
home buyers, who cannot afford larger sizes and therefore
larger budgets
960sq ft.
1155 sq ft.
1490 sq ft.
Duplex options after 16th floor for select sizes
In Phase II and III we will have both 2 BHK/3 BHK options
both on the affordable and premium ends.
What would be the rate per sq ft?
Pl refer to the cost sheet provided on our website and
also on request.
When will the booking be open?
1st Phase is open. 2nd phase we will launch in the next
45-60 days. But, if you are keen to book for the 2nd
phase we will accept bookings..
How do I book for 2nd Phase?
We will take a token amount of Rs. 50000/- for bookings
and we will take the final booking amount once we have
the final plans in the next 2 months or so.
When do we get to see the plans for the 1st Phase?
The master plan of the project and the individual floor
plans are available.
Is the project Vaastu compliant?
All Apartments are designed as per Vaastu for the three
primary parameters of main entry door, kitchen and the
location of the master bedroom.
What about the Bank approvals? Has any bank approved
the project?
We will have all the approvals by February 09
What are the basic amenities?
Mini Stadium including all outdoor and indoor facilities
Club houses
Retail centers
Primary school
Bank and ATM’s
Commune Square
Bal Bhawan
Golf putting range
Medical Store and Clinic
Two 40 seater buses for Shuttle service
Piped Gas
Rental management services
Cafes and Restaurants
Spa, Salon, Bakery
Wi-Fi enabled campus
What are the defining amenities in Commune?
A mini stadium which will house all the outdoor and
indoor sports facilities.
A world class retail center.
Bank and ATM’s
A primary school.
Will there be any modifications possible in the apartments?
There will be no modifications allowed due to the high
level of standardization in the layouts and design.
The designs however will be of maximum usability from
a consumer point of view with an efficiency of close
to 85% which is way above the industry standard.
Will the project be completed on time?
The first phase of dwelling units will be delivered
in 18 months from the date of commencement of construction.
Given that we are using the latest concrete fabrication
technology there should not be any significant delays
barring force majeure.
How are you able to deliver the dwelling units with
the superior amenities, at these low rates?
Due to the large no of units (3500 units) being built
in same location, the cost of the best materials, the
state of the art technology used for construction and
the cost of superior amenities-all gets shared among
the resident community.
•Since the large quantities required for such a huge
project, are ordered at the same time, we are able to
get the best prices from the vendors and the resulting
benefit is again shared among the resident community.
•Meticulous planning and design comforts, are done in
a pro-active manner anticipating the customer needs.
This results in basic requirements being taken care
of without any fancy frills.
•The bottom line is to deliver maximum value for money.
What about infrastructure development around the project?
Usually in new areas of property development, infrastructure
follows land development but in the case of Commune
core infrastructure is already fast taking shape. The
abutting Outer Ring Road (ORR) would be fully operational
by the next 16 months or so just in time prior to completion
of the project.
Since the ORR corridor will be up and ready by the time
the project goes on-stream there will be a lot of development
of commercial complexes, entertainment, educational
and medical options. A primary school will also be a
part of the Commune.
What about connectivity to the airport and the railway
station?
Reaching the new airport would be a smooth drive since
the neighboring ORR directly connects to the Shamshabad
Internatioanal Airport bypassing the city completely
and ensuring you reach Airport in 30 mts. The MMTS station
getting ready little more than a KM away connecting
the residents to the Central Business District (CBD)
of Begumpet/Punjagutta or Secunderabad in just 30mts.
Is it very far from the CBD?
Not really. Thanks to the MMTS facility closeby and
the main arterial roads that pass by very near to COMMUNE
the CBDs of CYBERABAD and Hyderabad/Secunderabad are
all well connected.
Will it be a good investment?
Yes, it certainly will be a very good investment with
rapid appreciation in the next 3-5 years. The moment
the ORR and the Growth corridor is up, there will be
lots of commercial and residential development along
its length. Given that equity markets are down it’s
a very good vehicle to invest alternatively from a risk
hedge point of view.
Will Manjeera water be provided?
Yes, subject to HMWSSB feasibility on payment of appropriate
charges by each flat owner. Proportionate cost of the
same will intimated in due course during the project
completion or post completion.
How de we get a confirmed allotment?
Based on the booking amount and prior to signing the
agreement of sale your Allotment will be confirmed and
& informed to you.
What if I cancel my booking?
No cancellation fees will be charged. Booking amount
will be refunded within 45 days from the intimation/cancellation
of your booking.
Is the Title of the Property clear?
Yes, the land is freehold, marketable and free from
all encumbrances and clear.
What are the legal documents to be signed by the Purchaser?
An Agreement of sale in completion will be issued to
the Purchaser. Agreement of sale is also the primary
document that facilitates Bank funding. Sale Deed is
the other document that will be registered.
What are the other Extras /additional amounts to be
paid?
"Extras" mean Costs to be borne additionally
by the purchaser at the time of registration/ possession
except that of the cost relating to Car park, power/water/sanitary
connections, Club House charges, Legal fee, maintenance
charges, Service tax/COT, Registration and stamp duty
charges are the other costs.
How will the Housing Financial Institutions disburse
my installments due?
Since these are equated quarterly installments on request
and consent from the purchaser and the builder the HFI
will ensure timely disbursement of installments.
Who will take care of the maintenance of the Project
after Completion?
The property will be maintained by us, for one year
till the formation of the residents Association. We
thereafter transfer the responsibility to the Association.
However the Mini stadium and Club House will be maintained
by GGPL.
When does Registration take place?
Registration will be done only on completion of the
Project and on payment of the consideration as per the
payment schedule provided.
Can I transfer the property before the registration?
Yes, you may transfer the property by paying a transfer
fee of Rs 50/- per sft and have an assignment of rights
executed.
What about the sanitary set up, will it be connected
to the mains?
The sanitary connections will not be connected to the
mains, but a separate STP will be installed as per the
norms.
What if the project is delayed? What would be the Penalty
Clause?
A penalty clause would be specified in the sale agreement,
towards this effect.
Do you give fully furnished/semi furnished apartments?
No these are not furnished apartments. We only offer
the Basic units completed in all respect.
What is the speculated appreciation after the project
is complete?
As per the conservative estimates, values are expected
to appreciate between 30-40% in a span of 18 months.
Do you offer rental management service for investors?
Yes. THE COMMUNE will have a full fledged Rental Management
system in place for investors.
What if the full amount is paid upfront? Do we have
any further benefits during the pre-launch offer?
Yes. We will offer additional discounts.
Are you constructing in phases? Then how many phase
would you intend?
Yes, to enable quick turn around, we will go in a phased
manner for early possession. There may be 3 to 4 phases
all together.
What is the source of the water?
Bore wells and STP recycled water for maintenance
When will construction for Phase 1 start?
Feb/March 09
Will there be visitor’s parking?
Yes
What is the construction technology used for construction?
RCC wall and roof Structure with modern form work (like
Mivan)
How is it superior to existing construction methods
by other builders?
The structure is monolithic with both walls and roof
in reinforced concrete , thus this is more safer than
conventional systems even in case of extreme whether
conditions and earth quakes . Assured Strength, consistent
quality, dimensional accuracy and speed are its major
qualities.
Is the structure earthquake resistant?
Yes, the designs are earth quake resistant and are designed
as per IS codes.
What is the Super Built up Area for the project?
@ 3.7 million sft of Super built up area with efficiency
of 81%.
Who will maintain the complex?
GGPL
Who are the promoters?
The promoters are in the business of real estate for
over a decade and have a strong pedigree in developing
world-class residential projects.
Can I upgrade later to a larger apartment?
Yes
How many clubhouses?
3 clubhouses with a total area of about 60,000 sq. ft.
(approx.)
What would be the membership charges?
Rs.75000/- for 1st phase. It will be reviewed upwards
for phases 2 and 3.
Who will be the owner of the Club house?
GGPL.
Will membership be open to outsiders?
No.
What will be the usage charges? Will the charges be
monthly?
Will be decided at a later date.
What will be car park charges?
Each Car Parking will be charged at 1.50 Lakhs
Is there enough car parking?
Yes. There will be sufficient car parking space.
Will there be a STP for Phase 1?
Ph1 and Ph2 will have common STP and will be ready by
the time ph 1 is finished.
|